香港法规

当前位置:首页 > 法律法规 > 香港法规

CAP 311G AIR POLLUTION CONTROL-法律法规

【法规名称】 CAP 311G AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATI...
【法规名称】 
【法规编号】 79390  什么是编号?
【正  文】

CAP 311G AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993


  (Cap 311 section 19(1))
  
  (L.N. 478 of 1994)
  
  [6 August 1993]
  
  (L.N. 312 of 1993)
  
  Cap 311G s 1 Notice of existing premises used for specified processes
  
  Notice of the existence of premises used for the conduct of any of the specified processes listed in Schedule 1, containing the particulars and information specified in the form set out in Schedule 2, shall be given in writing by the owner of the premises to the Authority, in the manner specified in that form.
  
  (Enacted 1993)
  
  Cap 311G s 2 (Omitted as spent)
  
  (Omitted as spent)
  
  (Enacted 1993)
  
  Cap 311G Sched 1 SPECIFIED PROCESSES
  
  [section 1]
  
  1. Aluminium Works
  
  2. Cement Works
  
  3. Ceramic Works
  
  4. Copper Works
  
  5. Gas Works
  
  6. Petrochemical Works
  
  7. Sulphuric Acid Works
  
  8. Tar and Bitumen Works
  
  9. Lead Works
  
  10. Asbestos Works
  
  11. Chemical Incineration Works
  
  12. Hydrochloric Acid Works
  
  13. Hydrogen Cyanide Works
  
  14. Sulphide Works
  
  15. Pathological Waste Incinerators
  
  16. Petroleum Works
  
  (Enacted 1993)
  
  Cap 311G Sched 2 FORM
  
  [section 1]
  
  AIR POLLUTION CONTROL ORDINANCE
  
  (Chapter 311)
  
  NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE
  
  CONDUCT OF A SPECIFIED PROCESS PURSUANT
  
  TO SECTION 19(1)
  
  To: The Authority
  
  1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct.
  
  This notification consists of ............ pages, with associated drawing (........... sheets).
  
  Signature: ..............................................................................................................................
  
  Name: ..................................................................................................................................
  
  Date: ....................................................................................................................................
  
  2. Details of Owner(s)
  
  Name(s) of Owner(s
  
  (Surname First)
  
  Status
  
  (e.g. lessee, occupier)
  
  Correspondence
  
  Address
  
  Telephone
  
  Number
  
  Identity Card/Certificate of
  
  Incorporation*
  
  Number
  
  English
  
  Chinese
  
  3. Premises where the Specified Process is Conducted
  
  Name of Premises
  
  Address
  
  TelephoneNumber
  
  English
  
  Chinese
  
  Contact Person in
  
  the Premises
  
  (Surname First)
  
  Title or Position
  
  Correspondence Address
  
  TelephoneNumber
  
  English
  
  Chinese
  
  Business Registration No.
  
  Certificate of Incorporation No.
  
  No. of Employees in the Premises
  
  Area of the Premises (m2)
  
  Land Status
  
  Names(s) of Land Owner(s)
  
  Address
  
  TelephoneNumber
  
  English
  
  Chinese
  
  4. Nature of Work
  
  Specified Process referred in Schedule 1 to the Ordinance
  
  Brief Description of Process
  
  Raw materials with Percentage
  
  Composition
  
  Products with Percentage Composition
  
  Raw Materials Consumption Rates (tonnes)
  
  Hourly
  
  Normal
  
  Product Production Rates (tonnes)
  
  Hourly
  
  Normal
  
  Maximum
  
  Maximum
  
  Daily
  
  Daily
  
  Monthly
  
  Monthly
  
  Annual
  
  Annual
  
  Installed/Processing* Capacity
  
  Total Silo Capacity (For Cement Works only)
  
  Operating Schedule
  
  Normal Operating Hours
  
  From To
  
  Operating Hours per Day
  
  Operating Days per Year
  
  5. Fuel Using/processing Equipment
  
  Emission Point No.
  
  Discharge Exit or Chimney Height (m above ground)
  
  Cross-section of Discharge Exit or Chimney
  
  Width (m)
  
  Length (m)
  
  Diameter(m)
  
  Equipment Serving the Emission Point
  
  Type of Equipment
  
  Equipment No.
  
  Date of Installation
  
  Dimensions of
  
  Equipment
  
  Width (m)
  
  Length (m)
  
  Height (m)
  
  Diameter (m)
  
  Mode of Operation (Continuous/Batch)
  
  Installed/Processing* Capacity
  
  For Batch Process
  
  Duration of each Batch (h)
  
  No. of Batches per Day
  
  For
  
  Fuel
  
  Using
  
  Equip-ment
  
  Type of Fuel Using Equipment
  
  Date of Installation
  
  Fuel to be Used
  
  Type
  
  Ash Content (%)
  
  Sulphur Content (%)
  
  Other Specifications
  
  Fuel Consumption Rate (kg/h)
  
  Maximum
  
  Normal
  
  Air Pollution Control Equipment
  
  Type
  
  Pollutant to be controlled
  
  Designed Efficiency (%)
  
  Operating Schedule
  
  Operating Hours per Day
  
  Operating Days per Month
  
  6. Drawings
  
  Please provide schematic diagrams of process flow showing the flow of materials, including raw materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers.
  
  * Delete whichever is inapplicable.
  
  (Enacted 1993. L.N. 212 of 1996)

相关内容

文章评论

表情

共 0 条评论,查看全部
  • 这篇文章还没有收到评论,赶紧来抢沙发吧~
王博 律师
知识产权,企业法律顾问,合同纠纷
电话:18938896818

点击排行

文章归档

评论排行榜

热门标签